MIL-DTL-21617B
4.5.13 Moisture resistance (see 3.6.12). Unmated plugs and receptacles shall be tested in accordance
with test procedure EIA/ECA-364-26. The following conditions shall apply:
a. Connectors shall be mounted in a horizontal position.
b. After initial conditioning no measurements are required and no voltages are to be applied to
connectors during exposure.
c. After final conditioning and completion of step 6 of the final cycle, the connectors shall be removed
from the cabinet and the unmated connectors shall meet the moisture resistance requirement as
4.5.14 Air leakage, type JS receptacle (see 3.6.13). While subject to a pressure differential of 30 psi
(207 kilopascals) at a stabilized temperature of -55°C, type JS pressurized receptacles shall not exceed
the requirement as indicated in 3.6.13 measured at atmospheric pressure under conditions specified
in 4.2.
4.5.15 Thermal shock (see 3.6.14). The mated connectors shall be subjected to temperature cycling in
accordance with test procedure EIA-364-32, test condition B, except that the lower temperature shall be -
55°C.
4.5.16 Salt spray (corrosion) (see 3.6.15). The mated plugs and receptacles and 25 sets of individual
pin and socket contacts shall be subjected to a salt spray (corrosion) test in accordance with test
procedure EIA-364-26, test condition B. The following conditions shall apply:
a. Upon removal, from the oven, the connectors shall be mated and shall meet the moisture
4.5.17 Solderability (see 3.6.16). Solder type contacts shall be tested in accordance with method 208
of MIL-STD-202.
4.5.18 Resistance to soldering heat (see 3.6.17). All connectors with solder terminations shall be
tested in accordance with test procedure EIA-364-56. The connectors shall be tested in accordance with
procedure 1.
5. PACKAGING.
5.1 Packaging. For acquisition purposes, the packaging requirements shall be as specified in the
contract or order (see 6.2). When packaging of materiel is to be performed by DoD or in-house contractor
personnel, these personnel need to contact the responsible packaging activity to ascertain packaging
requirements. Packaging requirements are maintained by the Inventory Control Point's packaging
activities within the Military Service or Defense Agency, or within the military service's system commands.
Packaging data retrieval is available from the managing Military Department's or Defense Agency's
automated packaging files, CD-ROM products, or by contacting the responsible packaging activity
17
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business