MIL-DTL-55074G
4.6.2.1.1 Sample plan. Each 12 months the number of sample units specified in table VI shall be
subjected to the inspections shown. If there has been no production run during this period, the
inspections shall be conducted on sample units selected from the first production run made following this
period.
4.6.2.1.2 Failures. If one or more sample units fail to pass group C inspection, the sample shall be
considered to have failed.
4.6.2.1.3 Disposition of sample units. Sample units which have been subjected to group C inspection
shall not be delivered on the contract.
4.6.2.1.4 Noncompliance. If a sample fails to pass group C inspection, the manufacturer shall notify the
qualifying activity and the cognizant inspection activity of such failure and take corrective action on the
materials or processes, or both, as warranted, and on all units of product which can be corrected and
which were manufactured under essentially the same materials and processes, and which are considered
subject to the same failure. Acceptance and shipment of the product shall be discontinued until corrective
action, acceptable to the qualifying activity has been taken. After the corrective action has been taken,
group C inspection shall be repeated on additional sample units (all inspection, or the inspection which
the original sample failed, at the option of the qualifying activity). Groups A and B inspections may be
reinstituted; however, final acceptance and shipment shall be withheld until group C inspection has shown
that the corrective action was successful. In the event of failure after reinspection, information concerning
the failure shall be furnished to the cognizant inspection activity and the qualifying activity.
4.6.2.2 Group D inspection. Group D inspection shall consist of the inspections specified in table VIII, in
the order shown. Group D inspection shall be made on sample units selected from inspection lots which
have passed the groups A and B inspections.
4.6.2.2.1 Sampling plan. Each 24 or 36 months the number of sample units specified in table VI shall be
subjected to the inspections shown. If there has been no production run during this period(s), the
inspections shall be conducted on sample units selected from the first production run made following this
period.
12