MIL-PRF-18148D
receptacle and its components shall not sustain any damage from the forces applied to the
receptacle after being tested in accordance with 4.5.10. The receptacle shall also meet the
requirements of 3.11 during and after testing.
3.12.10 Life. If the plug's contact sockets are plated, then the plating shall be intact after
being tested in accordance with 4.5.11.1. The plug shall also meet the requirements of 3.12.7
and 3.12.8. If the receptacle's electrical contact pins are plated, then the plating shall be intact
after being tested in accordance with 4.5.11.2. The receptacle's mechanical engagement pins
shall not show significant wear after being tested in accordance with 4.5.11.2. The connector
shall also meet the requirements of 3.11 during and after testing.
3.12.11 Temperature shock. The connector shall not show damage after being tested in
accordance with 4.5.12. The connector shall also meet the requirements of 3.12.5. The plug
shall also meet the requirements of 3.12.7 and 3.12.8. The connector shall also meet the
requirements of 3.11 during and after testing.
3.12.12 Mechanical shock. The connector shall not show damage after being tested in
accordance with 4.5.13. The connector shall also meet the requirements of 3.12.5. The
connector shall also meet the requirements of 3.11 during and after testing.
3.12.13 Vibration. The connector shall not show damage after being tested in
accordance with 4.5.17. The connector shall also meet the requirements of 3.12.5. The plug
shall also meet the requirements of 3.12.7 and 3.12.8. The connector shall also meet the
requirements of 3.11 during and after testing.
3.12.14 Humidity. The connector shall not show damage after being tested in
accordance with 4.5.14. The connector shall also meet the requirements of 3.12.6. The plug
shall also meet the requirements of 3.12.7 and 3.12.8. The connector shall also meet the
requirements of 3.11 during and after testing.
3.12.15 Immersion and salt fog resistance. The connector shall not exhibit deleterious
effects indicated in table III during or after the tests of 4.5.15 and 4.5.16. The connector shall
also meet the requirements of 3.10 and 3.11 during and after testing. The plug shall also meet
the requirements of 3.12.6, 3.12.7, and 3.12.8. The receptacle shall also meet the requirements
of 3.12.6 and 3.12.9.
3.12.16 Air-tightness (applies only to receptacles). The receptacle shall not leak after
being tested in accordance with 4.5.18. The receptacle shall also meet the requirements of 3.11
during and after testing.
7
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business