MIL-PRF-31031B
TABLE VII. Group C inspection.
Inspection
Requirement paragraph
Test method paragraph
Subgroup 1
Corrosion 1/
Center contact retention (when
specified, see 3.1)
Subgroup 2 2/
VSWR
Corrosion
VSWR
Subgroup 3
VSWR
Connector durability
Vibration
Shock (specified pulse)
Temperature cycling 3/
VSWR
Cable retention force
Subgroup 4
Humidity
Corona level
RF high potential withstanding voltage
Coupling mechanism retention force
Safety wire hole pullout
Subgroup 5
Shielding effectiveness
Subgroup 6
RF transmission loss
Subgroup 7
Contact resistance
1/ Not applicable to sealed connectors.
2/ Applicable to sealed connectors only.
3/ Following this test and prior to performing VSWR, 3 cycles of mating and unmating shall be
accomplished.
19
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business