MIL-DTL-2726/19D
TABLE I. First article and conformance inspection.
First
Quality
Inspection
article
conformance
Examination
X
X
Insulation resistance
X
X
Dielectric withstanding voltage
X
X
Operation
X
X
Vibration
X
Shock
X
Salt spray
X
Effectiveness of enclosure
X
X
Dielectric withstanding voltage
X
Changes from previous issue. The margins of this specification are marked with vertical lines to indicate
where changes from the previous issue were made. This was done as a convenience only and the
Government assumes no liability whatsoever for any inaccuracies in these notations. Bidders and
contractors are cautioned to evaluate the requirements of this document based on the entire content
irrespective of the marginal notations and relationship to the previous issue.
Referenced documents. In addition to MIL-DTL-2726, this document references the following:
MIL-DTL-15291/7
MIL-DTL-2726/3
MIL-DTL-2726/9
MIL-DTL-2726/13
MIL-DTL-2726/16
MIL-E-24142/4
MIL-STD-108
CONCLUDING MATERIAL
Custodians:
Preparing activity
Navy - SH
DLA - CC
DLA - CC
(Project 5935-2014-031)
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change, you should verify the currency of the information
above using the ASSIST Online database at https://assist.dla.mil.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business