MIL-DTL-2726/42B
VERIFICATION
Verification shall be as specified in MIL-DTL-2726 and table I herein. The first article and
conformance inspections shall consist of the inspections as specified in table I, in the order shown.
TABLE I. First article and quality conformance inspection.
First
Conformance
Inspection
article
Examination
X
X
Insulation resistance
X
X
Dielectric withstanding voltage
X
X
Vibration
X
Shock
X
Salt spray
X
X
Effectiveness of enclosure
X
Dielectric withstanding voltage
X
Marginal notations are not used in this revision to identify changes with respect to the previous
issue due to the extent of the changes.
Referenced documents. In addition to MIL-DTL-2726, this document references the following:
MIL-DTL-2726/26
MIL-DTL-2726/27
MIL-E-24142/3
MIL-PRF-900
MIL-STD-108
CONCLUDING MATERIAL
Custodians:
Preparing activity
Navy - SH
DLA - CC
DLA - CC
(Project 5935-4714-000)
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change, you should verify the currency of the information
above using the ASSIST Online database at https://assist..daps.dla.mil.
3