MIL-DTL-2726/48D
Tests: The following tests shall be required.
TABLE I. First article and quality conformance inspection.
Inspection
First article
Quality conformance
Insulation resistance
X
X
Dielectric withstanding voltage
X
X
Operation
X
X
Vibration
X
Shock
X
Salt spray
X
Effectiveness of enclosure
X
X
Dielectric withstanding voltage
X
Magnetic permeability
X
X
Marginal notations are not used in this revision to identify changes with respect to the previous issue due
to the extent of the changes.
Referenced documents. In addition to MIL-DTL-2726, this document references the following:
MIL-DTL-2726/47
MIL-DTL-2726/50
MIL-E-24142/2
MIL-STD-108
MIL-S-15291
MIL-T-16366
Drawing 9000-S6202-74031-119
CONCLUDING MATERIAL
Custodians:
Preparing activity
Navy - SH
DLA - CC
DLA - CC
(Project 5935-4721-000)
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change, you should verify the currency of the information
above using the ASSIST Online database at https://assist.daps.dla.mil.
6