MIL-DTL-55302/94F
Qualification: Qualification is not required for this specification sheet.
First article testing (FAT): FAT shall be in accordance with MIL-DTL-55302, qualification inspection.
Sample size: 6 connectors shall be subjected to the FAT. All sample units shall be subjected to the inspections in
subgroup I. The sample units shall be divided equally into 3 groups of 2 and subjected to the inspection for their
particular subgroups. Contacts shall be tested as specified in subgroup 4A or 4B as applicable.
Changes from previous issue. The margins of this specification are marked with vertical lines to indicate where
changes from the previous issue were made. This was done as a convenience only and the Government assumes
no liability whatsoever for any inaccuracies in these notations. Bidders and contractors are cautioned to evaluate the
requirements of this document based on the entire content irrespective of the marginal notations and relationship to
the last previous issue.
Referenced documents. In addition to MIL-DTL-55302, this document references the following:
MIL-DTL-22520
MIL-I-81969/5
SAE-AMS-QQ-N-290
MIL-DTL-55302/90
ASTM A582/A582M
SAE-AMS2700
MIL-DTL-55302/91
ASTM B16/B16M
MIL-DTL-55302/92
ASTM B121/B121M
MIL-DTL-55302/93
ASTM B124/B124M
MIL-DTL-55302/95
ASTM B36/B36M
MIL-DTL-55302/96
ASTM D5948
MIL-DTL-55302/97
CONCLUDING MATERIAL
Custodians:
Preparing activity:
Army - CR
DLA - CC
DLA - CC
(Project 5935-2010-066)
Review activities:
Army - AR, AT, AV, CR4, MI
NOTE: The activities listed above were interested in this document as of the date of this document. Since
organizations and responsibilities can change, you should verify the currency of the information above using the
ASSIST Online database at https://assist.daps.dla.mil/.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business