MIL-DTL-55661C
TABLE III. Group B inspection.
Inspection
Requirement
Inspection
paragraph
paragraph
Interchangeability
3.8
4.8
Rotation (connector plug
only)
3.10.1
4.7.1
Pull (connector plug only)
3.10.7
4.7.7
Water immersion
3.10.8
4.7.8
Table IIIa. Inspection level.
Lot size
Sample size
1
to
8
5
9
to
15
5
16
to
25
5
26
to
50
5
51
to
90
5
91
to
150
11
151
to
280
13
281
to
500
16
501
to
1,200
19
1,201
to
3,200
23
3,201
to
10,000
29
10,001
to
35,000
35
35,001
to
150,000
40
150,001
to
500,000
40
500,001
to
over
40
4.5.1.4 Periodic inspection. Periodic inspection shall consist of Group C. Except where the results of
these inspections show noncompliance with the applicable requirements, delivery of products which have
passed Groups A and B shall not be delayed pending the results of these periodic inspections.
4.5.1.5 Group C inspection. Group C inspection shall consist of the inspections specified in Table IV.
Group C inspection shall be made on sample units selected from inspection lots which have passed the
Group A and B inspection.
4.5.1.5.1 Sampling for group C inspection.
4.5.1.5.1.1 Subgroup 1. For this subgroup, four (4) connectors shall be selected from the first units
produced or first production lot. For subsequent group C inspection, four (4) connectors shall be selected
every 3 months or 1,500 units, whichever comes first.
4.5.1.5.1.2 Subgroup 2. For this subgroup, two (2) connectors shall be selected from the first
production lot. For subsequent group C inspection two (2) connectors shall be selected every 6 months or
every 6,000 units whichever comes first.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business