Manufacturers that are qualifying this protective cover as a stand alone accessory
shall conduct the following sequence of verification tests:
Visual and mechanical examination
Salt spray
Coupling torque
Humidity
Insulation resistance at ambient temperature
Altitude immersion
Insulation resistance at ambient temperature
Dielectric withstanding voltage at sea level
Temperature cycling
Post test examination.
Manufacturers that are in the process of qualifying MIL-DTL-83538/4 receptacles
concurrently with MIL-DTL-83538/8 protective covers, as well as manufacturers
conducting periodic Group C, shall conduct the following sequence of tests:
Visual and mechanical examination
Salt spray
Coupling torque
Post test examination.
Changes from the previous issue: Marginal notations are not used in this revision to identify changes
with respect to the previous issue due to the extent of the changes.
Referenced documents. In addition to MIL-DTL-83538, this document references the following:
MIL-DTL-83538/4
MIL-DTL-83538/12
MIL-STD-1760
CONCLUDING MATERIAL
Custodians:
Preparing activity:
Army CR
DLA CC
Navy AS
Air Force 85
DLA CC
Review activities:
Army AR, MI
(Project 59352007-047)
Navy EC, MC, OS
Air Force 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document.
Since organizations and responsibilities can change. You should verify the currency of the information
above using the ASSIST Online database at https://assist.daps.dla.mil.
5
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business