MIL-PRF-39012E
TABLE VI. Inspection level.
Lot size
Sample size
VSWR sample size
1 to
4
All
1
5 to
15
5
1
16 to
50
2
5
51 to
90
5
3
91 to
150
11
3
151 to
280
13
3
281 to
500
16
3
501 to
1,200
19
5
1,201 to
3,200
23
5
3,201 to 10,000
29
5
10,001 to 35,000
35
5
35,001 and over
40
8
4.4.1.3.2 Disposition of sample units. Sample units which have passed all the group B inspection
may be delivered on the contract or purchase order, if the lot is accepted. Any connector deformed or
otherwise damaged during testing shall not be delivered on the contract or order.
4.5 Periodic inspection. Periodic inspection shall consist of group C. Except where the results of
these inspections show noncompliance with the applicable requirements (see 4.5.1.4), delivery of
products which have passed groups A and B shall not be delayed pending the results of these
periodic inspections.
4.5.1 Group C inspection. Group C inspection shall consist of the inspections specified in table VII,
in the order shown. Group C inspection shall be made on sample units selected from inspection lots
which have passed the groups A and B inspection.
4.5.1.1 Sampling plan. Twelve sample units of the same PIN shall be selected from the first lot
produced after the date of notification of qualification. Thereafter, twelve sample units of the same
PIN shall be selected from current production after 200,000 connectors have been produced, or not
less than once every 3 years, whichever occurs first. The sample units shall be divided equally and
subjected to the inspections of the six subgroups.
4.5.1.2 Failures. If one or more sample units fails to pass group C inspection, the lot shall be
considered to have failed.
4.5.1.3 Disposition of sample units. Sample units which have been subjected to group C inspection
shall not be delivered on the contract or order.
14
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business