MIL-PRF-39012E
4.5.1.4 Noncompliance. If a sample fails to pass group C inspection, the manufacturer shall notify
the qualifying activity and the cognizant inspection activity of such failure and take corrective action
on the materials or processes, or both, as warranted, and on all units of product which can be
corrected and which are manufactured under essentially the same materials and processes, and
which are considered subjected to the same failure. Acceptance and shipment of the product shall be
discontinued until corrective action, acceptable to the qualifying activity has been taken. After the
corrective action has been taken, group C inspection shall be repeated on additional sample units (all
tests and examinations, or the test which the original sample failed, at the option of the qualifying
activity). Groups A and B inspections may be reinstituted, however, final acceptance and shipment
shall be withheld until the group C inspection has shown that the corrective action was successful. In
the event of failure after reinspection, information concerning the failure shall be furnished to the
cognizant inspection activity and the qualifying activity.
TABLE VII. Group C inspection.
Inspection
Requirement paragraph
Test method paragraph
Subgroup 1
Center contact retention
Corrosion
Subgroup 2
VSWR (cabled)
Connector durability
Safety wire hole pullout
Subgroup 3
Center contact resistance
Vibration 1/
Shock (specified pulse) 1/
Thermal shock
Moisture resistance
Corona level 1/
RF high potential withstanding voltage 1/
Cable retention forces
Coupling mechanism retention force
Subgroup 4
RF leakage 1/
Subgroup 5
RF insertion loss 1/
Subgroup 6
Contact resistance
1/ These tests to be performed only during initial qualification as long as the qualifying design and
manufacturing process has not been changed.
15