MIL-PRF-49142B
4.3.3 Inspection routine. The sample shall be subjected to the inspections specified in table II. All
sample units shall be subjected to the inspection of group I. The sample units shall then be divided
equally into six groups of 5 units (class 1) or three units each (class 2) and subjected to the inspection for
their particular group and in the sequence given for that group.
4.3.4 Failures. One or more failures shall be cause for refusal to grant qualification approval.
4.4 Retention of qualification. To retain qualification, the contractor shall verify in coordination with
the qualifying activity the capability of manufacturing products which meet the performance requirements
of this specification. Refer to the qualifying activity for the guidelines necessary to retain qualification to
this particular specification. The contractor shall immediately notify the qualifying activity at any time that
the inspection data indicates failure of the qualified product to meet the performance requirements of this
specification.
10
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business