MS90564H
Group A sampling plan: Lot and sample sizes shall be specified in table I. Samples shall be randomly selected from the lot. If one or more defects are found, the lot shall be rescreened and defects removed. A new sample as specified in table I shall then be randomly selected. If one or more defects are found in the second sample lot, the lot shall not be supplied to this specification.
TABLE I. Group A sampling plan.
Lot size |
Sampling size |
1 to 13 14 to 150 151 to 280 281 to 500 501 to 1,200 1,201 to 3.200 |
100 percent 13 units 20 units 29 units 34 units 42 units |
Changes from previous issue. Marginal notations are not used in this revision to identify changes with respect to the previous issue due to the extent of the changes.
Referenced documents. In addition to MIL-DTL-22992, this document references the following: MS90556
MS90558
RR-C-271
CONCLUDING MATERIAL
Custodians: Preparing activity: Army - CR DLA - CC Navy - EC
Air Force - 85
DLA - CC (Project 5935-2012-194)
Review activities:
Army - AT, AV, MI
Navy - AS, CG, MC, OS Air Force - 19, 99
NOTE: The activities listed above were interested in this document as of the date of this document. Since organizations and responsibilities can change, you should verify the currency of the information above using the ASSIST Online database at https://assist.dla.mil.
4
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business