TABLE IX. Group B inspection (connectors).
Test
Requirement paragraph
Test paragraph
Examination of product 1/
3.3.3.4, 3.7.3.8
4.5.6
3.9.3.10, 3.9.3.11
Dielectric withstanding voltage sea level
3.6.1
4.6.1
Dielectric withstanding voltage altitude
3.6.1.1
4.6.1
Insulation resistance
3.6.2
4.6.2
Thermal shock
3.6.3
4.6.3
Vibration
3.6.4
4.6.4
Shock
3.6.5
4.6.5
Moisture resistance
3.6.6
4.6.6
Durability
3.6.7
4.6.7
Corrosion
3.6.9
4.6.9
Air leakage (class H)
3.6.19.6
4.6.19
Resistance to test prod damage
3.6.11
4.6.11
Contact separation
3.6.12
4.6.12
Contact resistance
3.6.13
4.6.13
Contact retention
3.6.8
4.6.8
Contact removal
3.6.8.1
4.6.8.1
Insert retention
3.6.14
4.6.14
1/ The contractor may use in-process controls for this requirement.
TABLE X. Sampling plan for group B.
Lot size
Sample size
1 to 13
100 percent
14 to 150
13 units
151 to 280
20 units
281 to 500
29 units
501 to 1200
34 units
1200 to 3200
42 units
4.5.3.2 Rejected lots. If an inspection lot is rejected, the contractor may rework it to correct the
defects, or screen out the defective units and resubmit for re-inspection. Resubmitted lots shall be
inspected using tightened inspection. Such lots shall be separate from new lots and shall be clearly
identified as re-inspected lots.
4.5.3.3 Disposition of sample units. Sample units, which have passed all of the group B inspection,
may be delivered on the contract or purchase order if the lot is accepted and sample units are still within
specified tolerances.
4.5.4 Periodic inspection. Periodic inspection shall consist of group C inspection. Except where the
results of these inspections show noncompliance with the applicable requirements (see 4.5.4.1.4),
delivery of products which have passed groups A and B inspections shall not be delayed pending the