MIL-DTL-26518C
TABLE VI. Qualification and periodic inspection (connectors).
Class R
Class
Inspection
Requirement
Method
sample number
H
paragraph
paragraph
1
2
3
4
5
6
7
8
All
3.1, 3.3, 3.5, 3.7, and
Inspection of product
4.7.1.1
X
X
X
X
X
X
X
X
X
3.8
3.6.1
Dry arc resistance (insert material disks)
4.7.2
3.6.2
Magnetic permeability (Class R)
4.7.3
X
X
X
X
X
X
X
X
X
3.6.3
Connector mating and unmating force
4.7.4
X
X
X
X
X
X
X
X
X
3.6.4
Maintenance aging
4.7.5
X
X
X
X
X
X
X
X
X
3.6.5
Contact insertion force
4.7.6
X
X
X
X
3.6.6
Thermal shock
4.7.7
X
X
X
X
X
X
X
X
X
3.6.7
Dielectric withstanding voltage
4.7.8.
3.6.7.1
At sea level
4.7.8.1
X
X
X
X
X
X
X
X
X
3.6.7.2
At altitude 1/
4.7.8.2
X
X
3.6.8
Fluid immersion
4.7.9
X
X
3.6.9
Vibration (mated)
4.7.10
X
X
X
X
X
3.6.10
Physical shock
4.7.11
X
X
X
3.6.11
Durability
4.7.12
X
X
X
3.6.12
Moisture resistance
4.7.13
X
X
X
3.6.13.1
Insulation resistance
4.7.14.1
X
X
X
3.6.14
Salt spray (corrosion (unmated))
4.7.15
X
X
X
3.6.15
Temperature life
4.7.16
X
X
X
3.6.16
Contact resistance
4.7.17
X
X
X
3.6.13.2
Insulation resistance (high temp) 2/
4.7.14.2
X
X
X
3.6.17
Ozone exposure (unmated)
4.7.18
X
X
3.6.13.1
Insulation resistance
4.7.14.1
X
X
3.6.18
Insert retention
4.7.19
X
X
3.6.3
Connector mating and unmating force
4.7.4
X
X
X
X
X
X
X
X
X
3.6.7.1
Dielectric withstanding voltage (mated)
4.7.8.1
X
X
X
X
X
X
X
3.6.19.1
Air Leakage (Class R)
4.7.20.1
X
X
X
X
3.6.19.2
Air leakage (Class H)
X
4.7.20.2
3.6.20
Contact retention
4.7.21
X
X
X
X
X
X
3.6.21
Altitude immersion
X
4.7.22
X
X
X
X
X
X
3.6.13.1
Insulation resistance
X
4.7.14.1
X
X
X
X
X
X
Dielectric withstanding voltage, altitude
X
X
X
X
X
X
X
(mated)
3.6.7.2
X
4.7.8.2
X
X
X
X
Contact insertion force
3.6.5
X
4.7.6
X
X
X
X
Examination of product
3.1, 3.3, 3.5, 3.7, and
X
4.7.1.2
X
X
X
X
X
X
X
X
3.8
1/ For initial Qualification only.
2/ Unless conducted during thermal shock.
4.5.3 Failures. One or more failures shall be cause for refusal to grant qualification approval.
4.5.4 Verification of qualification. To retain qualification, the contractor shall verify in coordination with the qualifying activity the
capability of manufacturing products, which meet the performance requirements of this specification. Refer to the qualifying activity at
any time that the inspection data indicates failure of the qualified product to meet the performance requirements of this specification.
4.6 Conformance inspection.
4.6.1 Inspection of products for delivery. Inspection of product for delivery shall consist of group A inspection.
4.6.1.1 Group A inspection. Group A inspection shall consist of the tests specified in table VII.
9
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business