MIL-DTL-3607C
TABLE III. Group B inspection.
Inspection
Requirement
Inspection
paragraph
paragraph
Subgroup 1
Visual and mechanical examination:
4.5.1
Outer contact solder joint
3.3.3.2.1
4.5.1.3
Assembly and rotation
3.3.4
4.5.1.4
Subgroup 2
Leakage (applicable only to pressurized connectors)
3.5
4.5.3
Subgroup 3
Visual and mechanical examination:
Physical dimensions1/
3.3
4.5.1
1/ Only those dimensions specified (see 3.1), shall be checked.
TABLE III-1. Sample and lot size.
Lot size
Sample size
1
to
8
5
9
to
15
5
16
to
25
5
26
to
50
5
51
to
90
5
91
to
150
11
151
to
280
13
281
to
500
16
501
to
1,200
19
1,201
to
3,200
23
3,201
to
10,000
29
10,001
to
35,000
35
35,001
to
150,000
40
150,001
to
500,000
40
500,001
to
over
40
4.4.1.4 Periodic inspection. Periodic inspection shall consist of group C. Except where the results of
these inspections show noncompliance with the applicable requirements, delivery of products which have
passed Groups A and B shall not be delayed pending the results of these periodic inspections.
4.4.1.5 Group C inspection. Group C inspection shall consist of the inspections specified in table IV.
group C inspection shall be made on sample units selected from inspection lots which have passed the
group A and B inspections.
4.4.1.5.1 Sampling for group C inspection.
8
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business