MIL-DTL-55116D
TABLE VI. Group B inspection.
Inspection
Requirement
Test method
Sampling
paragraph
paragraph
procedure
Contact resistance
3.5.3
4.7.3
Contact retention
3.6.4
4.8.4
See table VII
Interchangeability
3.6.5
4.8.5
Contact depression
3.6.1
4.8.1
TABLE VII. Sample sizes for group B inspection.
Lot size
Contact
Contact
Interchangeability
Contact
resistance
retention
depression
2
to 3
All
All
All
All
4
to 13
3
3
all
3
14
to 25
3
3
13
3
26
to 50
5
5
13
5
51
to 90
6
6
13
6
91
to 150
7
7
13
7
151
to 280
10
10
20
10
281
to 500
11
11
29
11
501
to 1,200
15
15
34
15
1,201
to 3,200
18
18
42
18
3,201
to 10,000
22
22
50
22
10,001
to 35,000
29
29
60
29
35,001
to 150,000
29
29
74
29
150,001
to 500,000
29
29
90
29
500,001
and over
29
29
102
29
TABLE VIII. Group C inspection.
Inspection
Requirement
Test method
Number of
paragraph
paragraph
sample units
Pull Test
3.6.7
4.8.7
2
Humidity
3.7.6
4.9.6
2
Mating Action
3.6.3
4.8.3
2
Temperature cycling
3.7.4
4.9.4
2
Vibration
3.7.2
4.9.2
2
Salt spray
3.7.5
4.9.5
2
Bounce
3.7.1
4.9.1
2
Drop
3.7.3
4.9.3
2
Water immersion
3.7.7
4.9.7
2
Compression
3.6.6
4.8.6
2
4.6.5.2 Failures. If one or more sample units fail to pass group C inspection, the sample shall be
considered to have failed.
4.6.5.3 Disposition of sample units. Sample units which have been subjected to group C inspection
shall not be deliverable on the contract.
13
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business