MIL-DTL-83413C
TABLE II. Qualification inspection, connectors and jumper assemblies Continued.
Requirement
Jumper
Test
Plug
Receptacle
Clamp
Inspection
connector
assembly
paragraph
paragraph
Group III
X
X
3.5.15
4.7.16
X
X
Humidity
X
X
3.5.16
4.7.17
X
X
Temperature cycling
X
3.5.17
4.7.18
Drop
3.5.18
4.7.19
Altitude low temperature
X 2/
3.5.19
4.7.20
X
Dust
X
3.5.20
4.7.21
Fluid immersion
X 2/
X
X
3.5.22
4.7.23
Salt spray
X
X
Group IV
X
Lightning current 3/
3.5.23
4.7.24
1/ - X indicates that a test is applicable.
2/ - As applicable.
3/ - For initial qualifications only.
4.6 Conformance inspection.
4.6.1 Inspection lot. An inspection lot shall consist of all specimens of the same configuration produced
under essentially the same conditions, and offered for inspection at one time.
4.6.1.1 Group A inspection. Group A inspection shall consist of the inspections specified in table III.
There shall be no failures.
TABLE III. Group A inspection.
Inspection
Requirement paragraph
Test method paragraph
Visual and Mechanical
3.1,3.3,3.4
4.7.1
Engagement
3.5.5
4.7.6
Contact resistance
3.5.6.1
4.7.7.1
Clamp connector resistance 1/
3.5.6.2
4.7.7.2
1/ As applicable, see table II, group I.
4.6.1.1.1 Sampling plan (group A). Table II tests shall be performed on a production lot basis. Sample
size shall be randomly selected in accordance with table IV. If one or more defects are found, the lot
shall be rescreened and defects removed. A new sample, as specified in table IV, shall be randomly
selected. If one or more defects are found in the second sample lot, the lot shall not be supplied to this
specification.
11