MIL-DTL-83413C
TABLE IV. Lot and sample size.
Lot size
Sample size
1 to 12
100 %
13 to 150
13 units
151 to 280
20 units
281 to 500
29 units
501 to 1200
34 units
1201 to 3200
42 units
3201 to 10,000
50 units
10,001 to 35,000
60 units
35,001 to 150,000
74 units
150,001 to 500,000
90 units
500,001 and over
102 units
4.6.1.1.2 Rejected lots. If an inspection lot is rejected, the supplier may rework it to correct defects, or
screen out the defective units, and resubmit for re-inspection. Resubmitted lots shall be inspected using
tightened inspection. Such lots shall be separate from new lots, and shall be clearly identified as re-
inspected lots.
4.6.2 Periodic inspection. Periodic inspection shall consist of the group B inspection. Except where the
results of this inspection show noncompliance with the applicable requirements (see 4.6.3), delivery of
products which have passed group A shall not be delayed pending the results of the periodic inspections.
4.6.2.1 Group B inspection. Group B inspection shall consist of the inspections shown in
table II, groups II and III, as applicable, in the order specified. Group B inspection shall be made on
sample units selected from lots which have passed the group A inspection. Sample units which have
been subjected to group B inspection shall not be delivered on the contract.
4.6.2.1.1 Sampling plan. A sample size shall be randomly selected in accordance with table IV. If one or
more defects are found, the lot shall be rescreened and defects removed. If one or more defects are
found, a new sample shall be randomly selected from table IV. If one or more defects are found, the lot
shall not be supplied to this specification.
4.6.2.1.1.1 Connectors and jumper cable assemblies. Sample sizes for connectors and jumper cable
assemblies shall be 6 specimens (group I), which shall be subdivided into two groups of three specimens
and subjected to the tests in groups II and III in table II.
4.6.2.1.1.2 Grounding assemblies. Sample size shall consist of 6 specimens, with 3 tested as individual
parts (plugs and grounding clamp connectors only), and 3 tested as a full assembly as specified in group
III in table II.
4.6.2.1.2 Disposition of sample units. Sample units which have been subjected to group B inspection
shall not be delivered on the contract.
12