MIL-DTL-24231E(SH)
e.
f.
Wires and cables required if other than specified (see 3.4.2).
g.
Conductor color code required if other than specified (see 3.4.2.1).
h.
When pressure-proof caps are required (see 3.4.4.1).
i.
When sealing plugs are required (see 3.4.4.2).
j.
Underwater explosion requirement and test procedures required for Types III and IV fittings (see 3.5.7).
k.
When a first article inspection report is required (see 4.2).
l.
When a conformance inspection report is required (see 4.3.1).
m. Packaging requirements (see 5.1).
n.
Levels of packaging and packing required (see 6.6).
o.
Special marking required (see 6.7).
p.
Inspection of industrial packaging required (see 6.8).
q.
Wiring table to be used, where applicable (see Appendix A).
6.3 First article. When a first article inspection is required, the item should be a first production item. The first
article should consist of one unit. The contracting officer should include specific instructions in acquisition
documents regarding arrangements for examinations, approval of first article test results and disposition of first
articles. Invitations for bids should provide that the Government reserves the right to waive the requirements for
samples for first article inspection to those bidders offering a product which has been previously acquired or tested
by the Government, and that bidders offering such products, who wish to rely on such production or test, must
furnish evidence with the bid that prior Government approval is presently appropriate for the pending contract.
6.4 Sub-contracted material and parts. The packaging requirements of referenced documents listed in section 2
do not apply when material and parts are acquired by the contractor for incorporation into the equipment and lose
their separate identity when the equipment is shipped.
6.5 Material control objective quality evidence.
6.5.1 Objective evidence. When specified in the contract or order, material control quality evidence should be
prepared (see 6.3). Each Ni-Cu-Al alloy single cable connector body, multiple cable connector body, multi-pin
receptacle body, hull insert plug, washer, nut, and HY80/HTS hull insert should be accompanied by material control
objective evidence that the material is in accordance with all the requirements of the applicable specification. The
following information should be a part of the objective evidence:
a.
Military part number (for example, M24231/7-001).
b.
Contract number.
Contractor s identity.
c.
d. Material certification and heat treatments with a statement to the effect that objective evidence is on file in
support of material identification and heat treatment, traceable from the part number (see 3.3.1 and 3.3.2.1).
e. Brinell or Rockwell hardness (three readings) with acceptable range of readings (except for multi-pin
receptacles).
f.
Direct reading of O-ring surface diameter with specified standard.
That "32" surface finishes are as shown on the applicable specification sheet and are free of imperfections.
g.
h.
Dye penetrant (MT where required) results of welded joints and parts, as applicable.
Signature or symbol of contractor s inspector.
i.
j.
Signature or symbol of Defense Contract Management Agency (DCMA) representative.