MIL-DTL-24231E(SH)
6.5.1.1 Delivery. The contractor should pack one copy of the objective quality evidence with the item (see 6.6)
and retain a duplicate copy on file. The cognizant inspection service is authorized to withhold shipment until the
required objective quality evidence is in accordance with this specification. Failure to provide acceptable objective
quality evidence should be cause for rejection of the material.
6.6 Packaging, packing, and marking. Pressure-proof fittings or single items should be packaged level A or C,
packed level A, B, or C as specified (see 6.2), and marked in accordance with MIL-E-17555 except that descriptive
details and plans and testing of a first article pack are not required. In addition, the following apply:
a.
O-rings furnished separately with the hull fitting should be individually packaged and marked in
accordance with SAE-AMS2817. Each packaged O-ring should be placed within the applicable package.
b.
Unassembled (loose) parts should be packaged in a cloth or plastic bag and should be placed within the
applicable package (see 3.4.11).
c.
Prior to unit packaging, each fitting should be fitted with a metal or plastic cap on both ends of each
assembly as applicable, to protect contacts and insulators from entry of foreign matter and to protect the
metal surfaces from mechanical and physical damage.
6.7 Marking. In addition to any special marking required (see 6.2), unit, intermediate, and exterior shipping
containers should be marked for shipment in accordance with MIL-STD-129 and should include bar code markings
on unit packs.
6.8 Inspection of packaging. Except when industrial packaging is specified, the sampling and inspection of the
preservation and interior package marking should be in accordance with groups A and B conformance inspection
requirements of MIL-STD-2073-1. The sampling and inspection of the packing and marking for shipment and
storage should be in accordance with the quality assurance provisions of the applicable specification shown in
section 6 and the marking requirements of MIL-STD-129. The inspection of industrial packaging should be as
specified (see 6.2).
6.9 Subject term (key word) listing.
Construction
Contacts
Fittings
Inserts
Packing
Performance
Plugs
6.10 Changes from previous issue. Marginal notations are not used in this revision to identify changes with
respect to the previous issue due to the extent of the changes.
15
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business