MIL-DTL-83513G
3.8 Change effectivity. Unless otherwise specified by the preparing activity and/or the qualifying
activity, all changes from the previous revision of MIL-DTL-83513 shall become effective at the date of
publication of the latest revision.
3.9 Disposition of stock. Unless otherwise specified by the preparing activity and/or the qualifying
activity, qualified manufacturers and their selling agents or distributors may ship from stock; connectors
and accessories which were manufactured in accordance with the previous revision of MIL-DTL-83513
for a period of 24 months from the date of the latest revision.
4. VERIFICATION
4.1 Classification of inspection. The inspections specified herein are classified as follows:
a. Qualification inspection (see 4.3).
b. Conformance inspection (see 4.4).
4.2 Inspection conditions. Unless otherwise specified herein, all inspections shall be performed in
accordance with the test conditions specified in the "GENERAL REQUIREMENTS" of MIL-STD-202 and
EIA-364.
4.2.1 Preparation of samples. Connectors intended for space applications shall be wired with the
appropriate length of wire in accordance with SAE-AS22759/33 (26 AWG). All other connector samples
shall be wired with the appropriate length in accordance with SAE-AS22759/11, (26 AWG). Termination
of wires to contacts shall be crimped or soldered.
4.2.2 Test equipment and inspection facilities. Test and measuring equipment and inspection
facilities of sufficient accuracy, quality, and quantity to permit performance of the required inspection
shall be established and maintained by the contractor. The establishment and maintenance of a
calibration system to control the accuracy of the measuring and test equipment shall be in accordance
with ISO 17025 or NCSL Z540.3.
4.2.3 Assembly plants. Assembly plants must be listed on or approved for listing on the applicable
qualified products list. The qualified connector manufacturer shall certify that the assembly plant is
approved for the distribution of the manufacturer's parts. The assembly plant shall use only piece parts
supplied by the qualified connector manufacturer. No testing other than visual inspection is required on
certified piece parts obtained from the qualified connector manufacturer, except when there is cause for
rejection. All assemblies produced at the assembly plant shall be subjected to examination of product to
assure that the assembly process conforms with that established at the qualified manufacturing plant.
Quality control requirements, including government inspection surveillance, shall be the same as required
for the qualified connector manufacturer.
4.2.4 Established reliability and high reliability practice . An established reliability and high reliability
practice shall be established and maintained in accordance with MIL-STD-790. Evidence of such
compliance shall be verified by the qualifying activity of this specification as a prerequisite for qualification
and continued qualification.
4.2.5 Fungus resistance. Certification of method 508.5 of MIL-STD-810 is required (see 3.3.8).
12
For Parts Inquires submit RFQ to Parts Hangar, Inc.
© Copyright 2015 Integrated Publishing, Inc.
A Service Disabled Veteran Owned Small Business